Man In The Arena Conference

Venue: Amerant Bank Arena – Sunrise, FL
Audience: 1,500 attendees
Role: Lead Audiovisual and Technical Production Partner (collaboration with Crew Label)
Scope Delivered
· Audio system design and deployment
· Lighting design and show execution
· LED, video, and IMAG systems
· Scenic and staging integration
· Intercom and show communications
· Labor, trucking, and logistics coordination (CP2 Logistics)
Operational Challenges
· Compressed arena load-in window
· Venue rigging and architectural constraints
· High-visibility program with multiple stakeholders
· Zero-tolerance environment for technical failure
Execution Highlights
· Engineered integrated production system for arena conditions
· Coordinated multi-vendor logistics and truck sequencing
· Maintained schedule integrity despite early transport challenges
· Delivered stable systems and clean show transitions
Outcome
· Successful delivery with no operational incidents
· Visually cohesive, technically reliable program
· Client rebooked AMS Events for multiple future programs
FIFA Relevance
· Demonstrates arena-scale execution
· Proven logistics coordination under time pressure
· Experience operating in high-stakes, high-visibility venue